Manual of Field Works (all Arms).

Manual of Field Works (all Arms).

4.11 - 1251 ratings - Source

Hard ground, grave], chalk, bricks, aamp;0., must be broken small so that when the sandbag is filled the material can be shaken into a compact, pliant mass. In this case the sandbags must not be beaten. A filling party should consist of three men , anbsp;...

Title:Manual of Field Works (all Arms).
Publisher: - 1925


You Must CONTINUE and create a free account to access unlimited downloads & streaming