Previously the fabrication method was. to lay out the material by placing six to ten 4a#39; x 12a#39; sheets of metal on an aquot;Aaquot; frame truck, ... The material was moved from the rack to the drill table where the drill templates were applied, pilot, tooi- ing, and other holes were stack drilled. ... with 26 employes, an increase of 18 tables or parts per shift with 15 less employes, a saving of 39, 000 man- hours per year.

Title:Plant Operating Management
Publisher: - 1947