Practical Schedule Risk Analysis

Practical Schedule Risk Analysis

4.11 - 1251 ratings - Source

Practical Schedule Risk Analysis, contains a complete treatment of schedule risk analysis from basic to advanced concepts. Benefits of the process, relationship to traditional critical path method scheduling and to project management, the role of the corporate culture in ensuring success and the criticality of collecting risk data are emphasized for the benefit of the practitioner.... CPM scheduling requires that changes in activity durations lead to the correct implications for their successor activities and for the project as a whole without manual intervention. ... The situation is shown in Figure 4.8, using Primavera P3.

Title:Practical Schedule Risk Analysis
Author:Dr David Hulett
Publisher:Gower Publishing, Ltd. - 2012-09-28